1、一、 施工组织设计Construction Organization Plan1、主要施工方法及技术方案The main job practice and the technical plan一、施工准备工作1th, the construction preparatory work1、技术准备The technology prepares组织项目部骨干成员熟悉和审查施工图纸:在施工前应研究熟悉设计图纸的详细内容,以便掌握设计意图。特别要注意的是施工说明、施工方法和施工界限。To organize the project department backbone member to be fam
2、iliar with with the examination construction blueprint: Should study the familiar design paper before the construction the detailed content, in order to grasps the design intention. Specially must pay attention is constructs the explanation, the job practice and the construction boundary. 2、物资准备Comm
3、odity preparation植物材料准备、机械设备准备、生活物资准备等。各材料均应及时进场。Plant material preparation, mechanical device preparation, life commodity preparation and so on. Various materials should promptly enter the arena. 3、劳动组织准备The labor organization prepares组织专业施工队伍进场,各成员的职责如下:To organize the specialized construction tro
4、op to enter the arena, various members responsibility as follows:项目经理全面负责本工程的各项事务。Project manager comprehensively is responsible for this project each business.项目技术负责人等技术人员负责检查施工方法、控制工序质量,从而达到质量目标的控制;Technical personnel and so on project technology person in charge is responsible to inspect the job
5、practice, the control working procedure quality, thus achieves the quality goal the control;技术负责人、技术员要亲自控制每株树的种植全过程;控制好植物群落种植的整体形态;The technical person in charge, the technician must personally control each trees planter entire process; Controls the flora to fall the planter the overall shape; 材料员负责
6、提供符合质量及树形要求的苗木,把好苗木供应质量关;The material responsibly provides conforms to the quality and the shape of tree request nursery stock, good nursery stock supply quality pass;施工员负责落实技术方案、组织人员进行施工操作;The construction is responsible to carry out the technical plan, the organization personnel carries on the con
7、struction operation;质检员负责材料、方法、工序等质量项目的检查和监督;The quality testing is responsible for mass term goal inspection and the surveillance and so on the material, method, working procedure;施工及养护操作人员负责按技术人员要求,进行规范化操作。Constructs and maintains the operator to be responsible according to the technical personnel
8、 to request, to carry on the standardized operation. 4、在施工现场合理安置临时设施。4、 In job location reasonable placement temporary facility. 二、园林景观组织施工设计及施工技术措施:The botanical garden landscape organization executive projectand constructs the technical measure: 塑造地形的目的(1) Molds the terrain the foundation which th
9、e goal 园林景观藉以依托的基础。 botanical garden landscape so as to depends on. 划分空间和组织空间。 Division space and organization space. 为生物多样性创造各自适宜的生态环境。 Ecological environment respectively is suitable which for the biodiversity creation. 主要景观因素(2) Main landscape factor1、 运动场。1,Athletic field. 2、微地形起伏。2, Microrelief
10、. 3、喷灌系统3,The spray irrigation system 4、喷泉设备4, The eruptive fountain equipment 主要技术措施及依据(3) Main technology measure and rests on 严格控制水土流失,关键在于园路、入口、池等与绿块的连接,采用草皮、灌木、防水层,控制在1.5%左右。 Strict conservation of soil and water, the key lies in the garden road, the entrance, the pond and so on with the green
11、block connection, uses the sod, the bush, the waterproof layer, controls about 1.5%. 文明施工、安全第一。在预期施工中,始终贯彻安全第一的方针,进入施工现场必须所需佩带防护用品。2米以上登高作业需要有防护装置及材料,做到以人为本,安全文明施工,具体规则另行表具。 Civilized construction, safety first. In the anticipated construction, throughout implementts the safety first the policy, ent
12、ers the job location to have to have to wear the protection thing. 2 meters above climbs up works need to have the protective equipment and the material, achieves humanist, the security civilization construction, the concrete rule separate table has. 在设计过程中,强调对整个环境的绿色保护,尤其对天然水和土壤的破坏,同时人为对已建绿地的破坏,更重要
13、是对人文资源的破坏。In the design process, emphasized to the entire environment green protection, especially to the natural water and the soil destruction, artificial to has simultaneously constructed the green place the destruction, is important is to the humanities resources destruction. 园路及硬质地面铺设(4) The ga
14、rden road and the flinty ground lay down 严格按图纸设计要求定购材、物料。 strictly according to the blueprint design request fixed purchase material, the material. 按规定配合好水泥、砂、石子的比例。 Coordinates the good cement, the granulated substance, the gravel proportion according to the stipulation. 加强保养工作,及时显示栏杆等标志。 Strengthe
15、ns the maintenance, promptly demonstrates symbol and so on parapet. 喷泉、分支喷灌系统(5) The eruptive fountain, the branch spray irrigation system 按消防有关规定实施组织施工。 presses the fire related stipulation implementation organization construction. 按土建施工要求,根据图纸设计组织施工。 According to construction construction request, according to blueprint design organization construction. 明确甲方总水给水管道,按图施工,同时掌握材料质量,确保万无一失。3, Is clear about the party of the first part total water feed water pipe, according to the chart construction, simultaneously grasps the material quality, guarantees surefire.三、主要施工方法及技术方案:Third,