syntheticplatformdetailintroduction.ppt

上传人:王** 文档编号:658989 上传时间:2023-12-08 格式:PPT 页数:35 大小:7.29MB
下载 相关 举报
syntheticplatformdetailintroduction.ppt_第1页
第1页 / 共35页
syntheticplatformdetailintroduction.ppt_第2页
第2页 / 共35页
syntheticplatformdetailintroduction.ppt_第3页
第3页 / 共35页
syntheticplatformdetailintroduction.ppt_第4页
第4页 / 共35页
syntheticplatformdetailintroduction.ppt_第5页
第5页 / 共35页
syntheticplatformdetailintroduction.ppt_第6页
第6页 / 共35页
syntheticplatformdetailintroduction.ppt_第7页
第7页 / 共35页
syntheticplatformdetailintroduction.ppt_第8页
第8页 / 共35页
syntheticplatformdetailintroduction.ppt_第9页
第9页 / 共35页
syntheticplatformdetailintroduction.ppt_第10页
第10页 / 共35页
亲,该文档总共35页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《syntheticplatformdetailintroduction.ppt》由会员分享,可在线阅读,更多相关《syntheticplatformdetailintroduction.ppt(35页珍藏版)》请在优知文库上搜索。

1、Synthetic platform detail introductionContentsWhy to build up synthetic platformSwitchgear making&breaking testing techniquesEnergy Sh-Lab synthetic platform structureWhy to build up synthetic platformBuild up a single phaseprototype based on theprevious experienceSubject it to short circuittest to

2、confirm the initialassumptionIntroduce modificationsbased on test results&repeat testthe requiredperformance of FPTCobtained?Build up 3 phase prototypethe requiredperformance of FPTCobtained?YesNoYesNoStandard development processProcess needs&limits from conventional test plant Single phase testing

3、accounts for 70%of the total development testingConventional test plant generator or network-Large,cumbersome to operate-Expensive-Difficult to make analysis if test failedThree phase short power needs for direct testingAbove table shows the three phase short circuit power that is required from the

4、primary source(generator or public network)to perform direct tests on MV CB for the IEC rated values.The approximate cost of a 2000MVA station powered by short circuit generator is 200 million RMB.8 8101012.512.516162020252531.531.5404036500620780100012501600200025002433042052067083010001300170017.5

5、250305380490605760950120012170210260330420520660850Voltage(kV)Voltage(kV)Current(kA)Current(kA)Three phase short power(MVA)for direct testingThree phase short power(MVA)for direct testingPrinciple of synthetic test Divide short-circuit breaking into 2 phases to reduce necessary power High current ph

6、ase(short-circuit)High voltage phase(Transient recovery voltage)High current phase:supply the short circuit test current from a source of much lower voltage than the breaker rated voltage High voltage phase:provide voltage stress after interruption from a low power high voltage sorce Synthetic lab i

7、s thus composed of 2 banks A high current one A high voltage one with good time coordination between both 1 msSeparation sufficient to withstand TRVsopening of contactstExtinction of arcAdvantage of synthetic testingEffectiveness:Widely accepted as an equivalent method as direct testing.Efficiency:P

8、roducing large number of tests quickly.Economic:Significant cost reduction on the installation compare with the cost of power source needed for direct testing.Easy to operate and maintain.Protection of prototype under test:Significantly reduction of damage to the prototype even if the test failed.Co

9、nvenience for analysis Provide possibility to stop testing when time analysis of results or prototype modification is needed.Suitable environment to attempt the sophisticated measurements required to know what is happening in the interrupter,particularly during the few vital microseconds immediately

10、 before and after current zero.Switchgear making&breaking testing techniques3 basic types of short circuit test for MV&HV CBShort circuit current making&breaking testLoad current making&breaking testShort time withstand&peak withstand current testThe most demanding test for CB is the breaking of its

11、 rated short circuit current.Most of the test station are fed by specially designed short circuit generator,while others are connected directly to the public network.Certification tests on MV SWGR are always carried out by direct tests,i.e.the short circuit current supplied from a source with an ope

12、n circuit voltage equal to the rated voltage of the CB.Certification test on HV SWGR are normally carried out by synthetic tests due to the capacity limits of the source.IEC short circuit test requirements Test duty 1,2,3&4 involve breaks with symmetrical currents Test duty 5 is known as“break with

13、asymmetrical currents”and the severity of the test strongly depends on the instant of contact separation.The standard requires that timing is adjusted so that the FPTC separates its contacts in a major loop of current.Test dutyTest dutySequenceSequenceTest currentTest current(%of rated value)(%of ra

14、ted value)%of DC%of DCcomponents(*)components(*)No.1O-0.3-CO-3-CO orO-3-CO-3-CO10%20%No.2O-0.3-CO-3-CO orO-3-CO-3-CO30%20%No.3O-0.3-CO-3-CO orO-3-CO-3-CO60%20%No.4O-0.3-CO-3-CO orO-3-CO-3-CO100%20%No.5O-0.3-CO-3-CO orO-3-CO-3-CO100%Depends on thebreakers min.operating timeRemark(*):The%of DC compone

15、nt is referred to the ponent for a time constant of 45ms(X/R=14)Load current making&breaking tests Load currents making&breaking tests do not normally impose a demanding duty on the switchgear as fault currents do.However,switch failure like reignitions or current chopping can cause severe over-volt

16、age and damage the load insulation.Testing is required in particular for the disconnection to capacitive loads(like power factor correction capacitor&unloaded cables)&inductive loads(like induction motors&unloaded transformers)for two main reason:To satisfy customer,who is mainly concerned with maximum overvoltage likely to be generated by the SWGR in service and its relation to the insulation level of the network where it is going to be installed.To allow designer to find a compromise between t

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 办公文档 > PPT模板素材

copyright@ 2008-2023 yzwku网站版权所有

经营许可证编号:宁ICP备2022001189号-2

本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!