《3D中的井点降水.docx》由会员分享,可在线阅读,更多相关《3D中的井点降水.docx(4页珍藏版)》请在优知文库上搜索。
1、WellsaremodelledaslineelementsinPLAXIS3D.Alongtheselinesaspecifieddischargeisextractedfromorinfiltratedintothesoil.Notethatthedischargespecifiedisequallydistributedoverthelengthoftheline/well.Sowhenspecifyingamaximumtotaldischargeof50m3/dayandaline/welllengthof10m,theactualmaximumdischargecapacityis
2、5m7daym.3D中井使用线单元模拟。沿着线,一个指定的流量表示从土体中抽取或者注入的流量。注意:指定的流量等值的分布于整条线上。所以,当指定最大总流量为50m3day,线长IOm时,实际上的最大流量是5n?/day/m.Theabovealsomeansthat,whenforexamplehalfoftheline/wellisdeactivated(becausethecorrespondingvolumeisdeactivated)oronlyhalfoftheline/wellissubmerged,onlyhalfofthespecifiedmaximumtotaldischar
3、gecapacityisavailable.上述情况也意味着,假如当线单元的一半处于冻结状态(因为周边对应的实体处于冻结状态)或者仅仅一半线单元处于水位以下,那么,当前最大流量也仅有指定最大流量的一半。Ingeneralforpracticalsituationsyouwillonlyneedtomodelthe“filter“partofthewe11atacertaindepthbeneaththesurfacelevel.The“filter“beingtheopenorperforatedpartofthetubeorwellwherewatercanactuallyflowin(or
4、out,incaseofaninfiltrationwell).Sothereisnoneedtomodelthepartofthewellbetweensurfacelevelandfilter.nexampleforadeepwellispresentedbelow.一般实际工程中,仅需要模拟井在地下一定深度的“滤网段”。“滤网段”作为降水管或者降水井的透水部分,土中的水可以通过它渗入井内(也可以回灌到土中)。所以不需要模拟地表至“滤网段”之间的不透水段。下面有一个深井降水实例。Notethatinadditiontothemaximumtotaldischargecapacityyoun
5、eedtospecifytheminimumpossibleheadvalueinthewell(hmin).Whenthegroundwaterheaddropsbelowthisvaluenofurtherextractionwilloccur.Hereyoushouldchooseavaluecorrespondingtothetypeofwellyouareusing.Anexampleforadeepwellispresentedbelow.Herethehrinischoseninsuchawaythatwhenpartofthepumpbecomesdrytheextractio
6、nstops.注意:除了指定最大抽水量以外,还需要指定井内的最小的水头值(Ln)。当地下水水头降低到这个水头以下时,将不再进一步抽水。最好根据井的类型,输入一个适合的值。下面有一个深井降水实例,Ln选择方法是,当部分抽干,抽水停止。DeepwellwithfilterandsubmergedpumpYoucanfindtheactualcalculateddischargesinthestressesmenuinOutput(Stresseswells).Thetotaldischargeispresentedforeach(activated)we11.Notethatinthetablet
7、hetotaldischargeisrepeatedforeachnodeofthewe11.Thetotalachieveddischargeperwellhoweverisjustonetimethisvalue.可以求得真实的抽水量,在输出程序的应力菜单中可以查看(应力井)。总的流量是总和了所有激活的井。注意,表格显示时,总流量代表井的每个节点。每个井的总抽水量是即时的值。Notethatinthecurrentimplementationwellsshouldnotbeplacedinsidethegeometryinsuchawaythattheycrossmultiplesoill
8、ayers.Thismayleadtoinaccurateresultsandisalimitationofthecurrent(3D2012.00)implementation.Hence,themodelledfilterpartofawellshouldalwaysbeinsideonesoillayer.ThisissuewillbefixedinanupcomingversionofthePLAXIS3Dprogram.注意,当前使用的并不应该穿越多个土层,这可能导致不精确的结果,而且属于当前版本(3D2012.00)的限制。因此,模拟井的“施网段”应该在同一个土层中。以后的版本将进
9、行改进和完善。测试模型:X方向120m,y方向100m,弯曲隧道直线段30m,弯曲段半径30m,地层等厚度IOm,中间层渗透系数0.6md,顶层与地层渗透系数08md,降水井设置不同抽水量,进行抽水计算。工况1:Q1=100m3d,hmin=-18mo图1:-z平面水压力等值线(图例0-60kpa)可见隧道范围内的土体未被疏干。图2:y-z平面水压力等值线(图例0-60kpa)实际降水影响范围可能会更大。降水后水位线符合经验。e.8ftH-0.04183m(元1703在节方37017)图4:降水引发的地层变形沉降范围与降水范围吻合。但左右边界有较大的非真实变形,因此边界应该指定为固定约束。当单井流量设置为IOm3/d时。降深减小。